+86 131 1528 8639
You are here: Home » SPC Flooring » Wood Designs » CMP1040 SPC Wood Flooring

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Product Description

Wood Plank SPC Flooring's Texture Options:

Registered Embossment

Registered Emboss 

Our factory has  20+ collections and 200+ designs and colors of E.I.R texture options.

Real Wood

Real Wood

This texture is widely used on wood designs of vinyl flooring.

Handscraped

Handscraped

This texture has Min. thickness inquiry from 4.5mm.

BP texture

BP 

This texture is the most popular texture on vinyl flooring. 

Brand Name OEM/ODM/CARSEM Design Wood SPC Vinyl Flooring
Material

Resin PVC, Calcium carbonate(Grade A),Stabilizer(environmental

Usage Indoor
UV Coating Options Ceramic Bead/Anti-microbial/Anti-Stain Thickness 3.5mm to 6mm
Backing Options 1mm to 2mm IXPE/EVA/Cork underlayment Gloss Level Matt, Glossy
Bevel Treatment Micro bevel, Painted bevel Density

2000kgs/M3

Product Name SPC Vinyl Flooring for indoor Feature Waterproof Wear Resistant Anti-slip
Certificate ISO9001, ISO14001, CE, Floor Score, SGS, VOC, TUV, Greenguard  Click System Click System
Packing method Carton, solid wood pallet Advantage Eco-friendly / 100% Waterproof



Technical Data

Factory's Test ItemsFactory's StandardsTesting Method
Flaw, Crack, Wrinkle, Hold, SeparatingNot   AllowedGB4085-83
Color DifferenceTwo   Tones AllowedGB4085-83
Dirt, Color ChangeNot   Easily NoticeableGB4085-83
Specifications
Length Measurement±   0.1mm(≤6")EN427
± 0.3mm(12" ~ 24")
± 0.5mm(≥36")
Overall Thickness±   0.15mmEN428
Squareness≤0.25mmEN427
Straightness≤0.25mmEN427
Physical Statistics
Dimensional Stability to Heat≤0.12%EN434
(80℃, 6Hrs)
Curling After Exposure To Heat≤1.2mmEN434
(80℃, 6Hrs)
Wear Resistance≤0.015gEN-660-2
Peel Resistance≥2.8Kgf/2cmEN431
Residual Indentation After Static Loading≤0.1mmEN434
FlexibilityNo   DamageEN435
All products comply to EN 14041:2004 Safety   Standards
Product SpecificationsStandardTesting   Method
Reaction to FireClass   Bf1-s1EN717-1
Formaldehyde EmissionNot   DetectedEN717-1
Determination of migration of heavy metalsNot   DetectedEN71
Effect of a caster chairPassEN425
Color Fastness to LightGrade(Blue   Wool Std):6EN   ISO 105 B02



Installation Guide

SPC Flooring Installation Instructions

ATTENTION – INSTALLER/OWNER RESPONSIBILITY Inspect “all” materials carefully before installation.

All SPC floorings are manufactured in accordance with accepted industry standards. Even though our product goes through many inspections before it leaves the factory, it is the responsibility of the customer andinstaller to perform a final inspection prior to installation.

TOOLS

Basic tools and accessories: broom or vacuum, chalk line, tapping block, cleaner, hand or electric jamb saw, miter saw, moisture meter, safety glasses, straight edge, table saw, tape measure, square, utility knife, pry bar and underlayment.

JOB SITE CONDITIONS

It is the responsibility of the installer/owner to determine if the job site sub floor and job site conditions are environmentally and structurally acceptable for SPC flooring installation, and any responsibility for SPC flooring failure resulting from or connected with sub-floor, subsurface, job site damage or deficiencies after the SPC flooring has been installed.


SUB-FLOOR PREPARATION AND RECOMMENDATIONS FOR ALL INSTALLATIONS


Concrete Sub-Floors New concrete slabs require a minimum of 60 days drying time before installation. All Concrete sub-floors must be dry, smooth and free of structural defects. Hand scrape or sand with a 20 grit #3-1/2 open face paper to remove loose, flaky concrete. Make sure that the perimeter of the foundation has adequate drainage and use a vapor barrier when installing below grade.


Sub-floor Moisture Check On and below grade applications are susceptible to moisture and should be tested for moisture prior to installation in several locations within the installation area. Acceptable conditions for above, on and below grade applications are: . Less than 3 lbs. /1000 sq. ft. /24 hrs.per ASTM 1869-89 (calcium chloride test) .


Less than a reading of 5.0 on a Tramex Concrete Moisture Encounter (moisture meter). To correct any sub-floor problems concerning moisture, either wait until the sub-floor dries to meet specifications or use appropriate moisture barrier.


Sub-floors Other Than Wood or Concrete Note: Carpet and rubber tiles are unacceptable underlayments and must be removed. Terrazzo, tile and any other hard surfaces that are dry, structurally sound and level, as described above, are suitable as a sub-floor.


Radiant Heated Sub-floors Before installing over a hydronic radiant-heated floor turn off heat and wait until the floor has reached room temperature. After installing the floor return the heat to the previous setting, slowly 2o at a time.


Caution: The slab surface must never exceed 85o F. in temperature.

INTERLOCKING SPC FLOORING INSTALLATION Preparation

Remove all moldings and wall-base and undercut all door casings with a hand or power jamb saw using a scrap piece of flooring and underlayment as a guide to ensure that you undercut the door jamb to the proper height.


“Racking the Floor” As you install the floor, blend the SPC planks from several cartons to provide a random look throughout the installation. As you continue working across the floor be sure to maintain the 9” minimum stagger between end joints on all adjacent rows.

Never waste material; use the left over pieces from the cuts to start the next row or to complete a row. All flooring installations must use a underlayment.


After allowing the floor to acclimate and ensuring that proper subfloor requirements are met, you can begin the installation by laying the underlayment. As you lay the first plank, use spacers to maintain the minimum 1/2” expansion gap around the perimeter of the room. Then lay the butt seams (end joints) onto each other for the first row.


The cut piece from the first row (which should be at least 9” long) will be used to start the second row. Be sure to always stagger the end seams a minimum of nine inches. To begin the second row, place the tongue of the cut piece into the groove and lock down into place. Place the second board of the second row into the groove and lock down into place. The butt seams will be held down by the following rows. The last row will be cut to fit and should be wider than two inches.


Final Touches: Install the proper trim molding at the doorways to achieve the transition and along the walls to cover the edges of any gaps along the wall due to irregularity. Remember when you are planning you installation to allow for T-molding transitions at all pass-through doorways that are less than 48"inches in width.


Installation Photos as below:

安装分步图




Previous: 
Next: 

Consult Your CARSEM FLOOR Experts

We help you avoid the pitfalls to deliver the quality and value your flooring needs, on-time and on-budget.
Consult Your Flooring Experts
We are one of the most professional flooring Chinese factories with 20+ years of production and export experience. SPC Flooring, MSPC Flooring, Laminate Flooring etc.

Products

Innovation Products

Contact Us
  sales@carsemfloor.com
  +86 131 1528 8639
   Building 1, Dianya Commercial Plaza, Xinbei District, Changzhou City, China
© COPYRIGHT 2022 JIANGSU CARSEM NEW MATERIALS CO., LTD ALL RIGHTS RESERVED.